Fill what you can below, then send it straight to our WhatsApp. Question 1 alone is enough to start — the rest you can add in the conversation.
Hello Leon, here is my enquiry about a carbon fibre part:
Your answers open in WhatsApp ready to send. We reply within one working day; an engineer reads them, not a sales inbox.
If carbon fibre is the wrong answer for this part, you will hear that first. DFM feedback comes before any price.
| Route | For |
|---|---|
| Sample | From 10 pcs. Verifying the design and the dimensions |
| Small batch | Testing before a production decision |
| Production | Process route and unit cost optimised |
We quote the route that fits your situation, not the one that gives the highest first order value.
A price without terms is not a quote. These four items are stated on every quotation, so both sides know where they stand before anything is cut.
30% deposit with the order, 70% before despatch.
Bank transfer (T/T). Currency is stated on the quotation. We do not ask for full payment up front on a first order.
A sample order can be quoted differently — ask, and it will be written down.
First article 7–15 working days for standard moulded and pressed parts, tooling included.
New tooling and complex geometry are scheduled separately. Batch dates are issued as a dated schedule with the order.
If a date slips, you hear the reason from us before you notice the delay.
Each batch is measured against the agreed drawing and quality plan. If a batch falls outside it, the rework or replacement route is written into the order before production starts. The warranty period is stated in the contract.
We quote a warranty we can honour, not a lifetime one we cannot.
Your drawing and 3D file are used only to quote and make your part. An NDA can be signed before any sample work begins, on request.
Signed by Leon Wu — the person who quotes you, not a legal inbox.
Four views from the shop — press, curing, machining and inspection. If you would like to see the rest, ask for a live walk-through and we will arrange one.
Hot press machine in production
SHOP FLOOR
Tube roll-wrapping in progress
SHOP FLOOR
Thermoplastic tape line
SHOP FLOOR
Inspection bench
SHOP FLOOR